Lead Paint Requirements
April 1, 2010

Beginning April 2010, federal law will require contractors that are hired to perform renovation, repair and painting projects in homes, child care facilities, and schools built before 1978 that disturb lead-based paint to be certified and follow specific work practices to prevent lead contamination.

 

Even before contractors are required to be certified and follow specific work practices, the contractor should follow these three simple procedures, described below:

1. Contain the work area. The area should be contained so that dust and debris do not escape from that area. Warning signs should be put up and heavy-duty plastic and tape should be used as appropriate to:

· Cover the floors and any furniture that cannot be moved.

· Seal off doors and heating and cooling system vents. These will help prevent dust or debris from getting outside the work area.

2. Minimize dust. There is no way to eliminate dust, but some methods make less dust than others. For example, using water to mist areas before sanding or scraping; scoring paint before separating components; and prying and pulling apart components instead of breaking them are techniques that generate less dust than alternatives. Some methods generate large amounts of lead-contaminated dust and should not be used. They are:

· Open flame burning or torching.

· Sanding, grinding, planing, needle gunning, or blasting with power tools and equipment not equipped with a shroud and HEPA vacuum attachment.

· Using a heat gun at temperatures greater than 1100°F.

3. Clean up thoroughly. The work area should be cleaned up daily to keep it as clean as possible. When all the work is done, the area should be cleaned up using special cleaning methods before taking down any plastic that isolates the work area from the rest of the home. The special cleaning methods should include:

· Using a HEPA vacuum to clean up dust and debris on all surfaces, followed by

· Wet mopping with plenty of rinse water.

When the final cleaning is done, look around. There should be no dust, paint chips, or debris in the work area. If you see any dust, paint chips, or debris, the area should be re-cleaned.

  

Courses available in Mississippi:

 

www.ce.msstate.edu/training

 

Or Call: (662) 325-5002

 

 

Visit Our Members

 

 

Home Builders & Remodelers Association of Northeast Mississippi
662.840.1125
FAX 662.840.0815
Email hbra@buildithere.com

Copyright © 2010 HB&RA Read Our Disclaimer